Customization: | Available |
---|---|
After-sales Service: | Returns and Exchanges |
Warranty: | Yes |
Still deciding? Get samples of US$ 0.6/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Railroad Rail Screw Railway Sleeper Fixing Spike
Types and Specification of Rail Spike
Ss Series Sleeper ScrewNo. | Type | Specification(mm) | Weight/kg | Surface | Standard |
Ss Series Sleeper Screw | Ss 1/130 | M22*130 | 0.451 | Zinc,Plain, Black Oil,etc | UIC,AREMA,JIS,GB or according to your requirements. |
Ss 1/150 | M22*150 | 0.478 | |||
Ss 2/180 | M22*180 | 0.595 | |||
Ss 5/150 | M24*150 | 0.545 | |||
Ss 6/130 | M26*130 | 0.658 | |||
Ss 6/150 | M26*150 | 0.702 | |||
Ss 6/170 | M26*170 | 0.785 | |||
Ss 7/180 | M24*180 | 0.636 | |||
Ss 8/140 | M24*140 | 0.528 | |||
Ss 8/150 | M24*150 | 0.548 | |||
Ss 8/160 | M24*160 | 0.568 | |||
Ss 23/160 | M23*160 | 0.645 | |||
Ss 24/165 | M24*165 | 0.59 | |||
Ss 25/165 | M25*165 | 0.625 |
Product Name | Specification(mm) | Material | Surface | Standard |
Square Head Screw Spike | M22*145 | 45# 55Q Q235 or According to your requirements. | Natural Zinc Paint Oil or According to your requirements. | UIC AREMA DIN GB or According to your drawings or samples. |
M22*155 | ||||
M22*165 M22*165 | ||||
M22*185 | ||||
M22*195 | ||||
Customized |
Product Name | Specification(mm) | Grade | Raw Material | Surface Treatment |
Double-head Screw Spike | 23*174 | 4.6, 5.6, 8.8, 10.9 | Q235, 35#, 45# | Plain (oiled), Bluing, Zinc, HDG, etc. |
Packing of rail screw spikes
Q: How long is your delivery time?
A: Generally within 25-30 days for a 40ft container after the prepayment received. Goods in bulk are also accepted.
Q: What is your terms of payment ?
A: 30% of the payment in advance , the balance before shipment via T/T.
Q: Will that be possible for us to receive pieces of samples for approval?
A: Sure. The samples can be supplied for free but the freight counts on you.
Q: How long will it be the quotation valid?
A: The validity is 15 days in general, but also depends on the quantity and special conditions. It will be shown in every quotation.